Elomatic Logo

Visions of Tomorrow – Engineered Today

World map
Leppäkosken Sähkö OyJyväskylän Voima
Toholammin Energia Oy

Toholammin Energia

ORC plant

  • Boiler: 8.2 MWth, BFB hot oil boiler (Filter AS). Cogenerated heat: 5.4 MWth for district heating. Electricity production: 1.3 MWe, (Turboden). Fuel: peat and wood chips. Multi-fuel receiving station with 3 pockets, conveying and receiving station (Saimatec Oy). Automation System: Siemens
  • Elomatic scope: Owner’s, basic and pre-engineering, inquiry and contract documentation, administrative and authorisation documentation, plant connection engineering