| Pratibha | 2007-2008 |
Crude oil tanker conversion to bulk carrier for Polarkonsult AS / Pratibha Shipping Company Ltd.
Elomatic's
commission:
Conversion concept design, stability calculations, strength analysis, class documentation, conversion specifications, material orders, visualisations, inspections onboard. The project was carried out in 2007-2008.
|  |
| |
| Tursas / Conversion | 2003-2005 |
Conversion of the Finnish Coast Guard vessels Tursas and Uisko at Uudenkaupungin Työvene.
Elomatic's commission for the Finnish Coast Guard:
Concept development and pre-contract design for extensive conversion. Performance of inclining test. The project was carried out in 2003..
Elomatic's commission for Uusikaupunki Workboat:
Basic and detailed design for hull, machinery, interior and deck outfitting. The project was carried out in 2003-2005
|  |
| |
| Enchantment of the Seas | 2003-2005 |
Lengthening of the Cruise Vessel Encantment of the Seas by Kvaerner Masa-Yards.
Elomatic's
commission:
Project engineer at site. Basic design for Machinery, Interior and HVAC. The project
was carried out in 2003-2005.
|  |
| | |
| Crystal Sympony | 2004 |
Conversion of SPA area on the cruise ship Crystal Symphony peformed by MML Shipbuilding.
Elomatic's
commission:
Conversion design including modular construction of spa area fitted onboard at Lisnave shipyard in spring 2004.
|  |
| |
| |
| Gute / lenghtening project | 2003-2004 |
Lengthening project for RoRo Passenger Ferry M/S Gute for Gotlandsbolaget.
Elomatic's
commission:
Lengthening study. General arrangement, capacity, longitudinal strength calculations, midship section, ice class calculations, stability evaluation and preliminary stability booklet. Machinery diagrams and conversion specification. The work was performed in 2003-2004.
|  |
| |
| Monarch of the Seas | 2003 |
Conversion of main dining rooms peformed by MML Shipbuilding.
Elomatic's
commission:
Conversion design for main dining rooms. The work was performed in spring 2003.
|  |