| Oasis
of the Seas Classsis |
2003-202006-2009
|
220.000 GT Cruise Vessel
constructed at
STX Finland Cruise Ltd
in Turku for Royal Caribbean Cruise Line.
Elomatic's
commission:
Basic design for aft third of the vessel including hull, machinery, interior, and HVAC. NAPA steel modelling. Participation in electrical design. Detailed design and production information for 30 grand blocks, main engine rooms and passenger outer decks. The work
has been carried out in 2006-2008.
|  |
| | |
| Freedom
of the Seas Class | 2003-2005 |
160.000 GT Cruise Vessel
constructed at Kvaerner Masa-Yards for Royal Caribbean Cruise Line.
Elomatic's
commission:
Basic design for Hull, Machinery, Interior, HVAC and Deck outfitting. Napa steel modelling. Participation
in electrical basic design at site. Detailed design for hull and technical machinery areas. Check of reference
standard for interior complexity. The project was carried out in 2003-2005.
|  |
| | |
| NCL | 2003-2006 |
92.250 GT Cruise vessel built by Meyerwerft for NCL.
Elomatic's
commission:
Hull Superintendent to act as a member of NCL's site team for newbuildings 667 and 668 at
Jos L. Meyer's shipyard in Papen-burg. The work was carried out in 2003-2006.
|  |
| | |
| Color Fantasy | 2003-2004 |
72.000 GT Cruise Ferry
constructed at Kvaerner Masa-Yards for Color Line.
Elomatic's
commission:
Basic design for AC ducting. Participation in other areas of basic design. Class calculations.
Architect and detail design for crew areas. Detail design and production information of passenger cabin areas.
Steel detail design. Detail design for machinery and technical rooms. Car deck outfitting design. The project
was carried out in 2003-2004.
|  |
| | |
| Brilliance of the Sea | 2002-2003 |
88 000 GT Passenger Cruise Ships
constructed at Meyer Werft for RCI
Elomatic's
commission for RCI:
Site assistance for hull. The project
was carried out during 2002-2003
|  |
| | |
| Crystal Serenity | 2001-2003 |
68 000 GT Passenger Cruise Ship
constructed at Chantiers de l'Atlantique for NYK Line / Crystal Cruises
Elomatic's
commission for CAT:
Hull modelling, workshop drawings and production information for an extensive
part of the vessel. HVAC pre-coordination and coordination design for one fire zone.
Elomatic's
commission for NYK Line:
Site assistance for hull, outfitting, electrical, automation, and accommodation as well as technical assistance
to Project Manager. The project was carried out during 2001-2003.
|  |
| | |
| Queen Mary II | 2002 |
150 000 GT Passenger Liner
constructed at Chantiers de l'Atlantique for Cunard
Elomatic's
commission:
Hull workshop drawings and production information for the aft part of the hull. The project
was carried out in 2002.
|  |
| | |
| Project America | 1998-1999,2002 |
72 000 GT Passenger Cruise Ship for the American market.
Constructed at
Litton Ingalls Shipbuilding for American Classic Voyages Co.
Elomatic's
commission:
Participating in contract and basic design. Contract design was carried out in 1998-1999. Entire detail design for the aft half of the ship. Hull fairing for the entire ship. The project
was completed in 2001.
|  |
| | |
| Sea America | 2000 |
47000 GT Cruise Ship for the American market. Contract design
done by Kvaerner Masa-Yards Technology for SeaAmerica Cruise Lines.
Elomatic's
commission:
Participation in the contract design of machinery, HVAC, outfitting, interior, safety and electrical systems. The project was carried out in 2000.
|  |
| | |
| Costa Atlantica | 1998-1999 |
80 000 GT Passenger Cruise Ship built by Kvaerner Masa-Yards, Helsinki New Shipyard for Costa Crociere.
Elomatic's
commission:
Hull structure design. Interior, HVAC and electrical detail design for public areas. Interior and
HVAC detail design for two-storied restaurant. Detail design of deck outfitting for the lifeboat deck. Machinery
spaces outfitting. The project was carried out during 1998-1999.
|  |
| | |
| Voyager of Seas | 1998-1999 |
137 000 GT Passenger Cruise Ship built by Kvaerner Masa-Yards, Turku New Shipyard for Royal Carribean Cruises Ltd.
Elomatic's
commission:
Basic design structure design. Interior, HVAC and electrical detail design for public areas. Interior and HVAC detail design for
two-storied restaurant. Detail design of deck outfitting for the lifeboat deck. Machinery spaces outfitting. The project was carried out during
1998-1999.
|  |
| | |
| Europa | 1998 |
28 400 GT Passenger Cruise Ship built by Kvaerner Masa-Yards, Helsinki New Shipyard for Hapag-Lloyd Ag.
Elomatic's
commission:
Classification drawings, hull modelling and production information of steel blocks, machinery workshop drawings for main
engine rooms and casing. Structural fire protection plans. The project was carried out in 1998.
|  |
| | |
| Aida | 1994-1996 |
Kvaerner Masa-Yards, Turku New Shipyard, Finland.
Elomatic's
commission:
Basic design and workshop drawings for electric & automation, interior,
machinery & piping and HVAC. Workshop drawings and production information for hull
sections. Project was carried out during 1994-1996.
|  |
| | |
| Grandeur of the Sea | 1994-1995 |
74 140 GT Passenger Cruise Ship built by Kvaerner Masa-Yards, Helsinki New Shipyard for Royal Caribbean Cruises Ltd.
Elomatic's
commission:
Auxiliary machinery and piping, workshop drawings and production information of hull sections, deck outfitting and service manuals.
HVAC for AC-rooms, cabins and public areas. Main and emergency switchboards. The project was carried out during 1994-1995.
|  |
| | |
| Crystal Symphony | 1993-1994 |
50 200 GT Passenger Cruise Ship built by Kvaerner Masa-Yards, Turku New Shipyard for the NYK Line/Crystal Cruises inc.
Elomatic's
commission:
Several design assignments for public spaces and cabins like HVAC and steel outfitting design of the restaurant, night club, entrance hall and shop area.
Electrical design for engine rooms and automation systems. The Project was carried out during 1993-1994.
|  |
| | |
| Royal Majesty | 1992 |
32 400 GT Passenger Cruise Ship
built by Kvaerner Masa-Yards, Turku New Shipyard for Majesty Cruise Line
Elomatic's
commission:
Electrical basic design and workshop drawings, general arrangement drawings for cabin areas and main staircases,
detailed cabin module design including mock-up cabins for cabin supplier and ship's scale model. The project was carried out in 1992.
|  |