| Orion
Oyj, Turku, Finland |
2009 |
Conceptual
design for the revamping of an
existing tabletting
manufacturing facility. |
|
|
|
| Omnitrade,
Amman, Jordan |
2009 |
Conceptual
design of a pharmaceutical
factory site including several
manufacturing facilities |
|
|
|
| Orion
Oyj, Espoo, Finland |
2009 |
Conceptual
design of a new facility for
inhalers. |
|
|
|
| Phadia
AB, Uppsala, Sweden (legacy
Pharmacia Diagnostics) |
2009 |
Conceptual
and detailed design for
increasing of production
capacity |
|
|
|
| Atacama
Labs, Helsinki, Finland |
2009 |
Automation
and qualification of a new dry
granulation system |
|
|
|
| Kemwell
AB (legacy Pfizer Health),
Uppsala, Sweden |
2009 |
Upgrading
of the electrical
documentation |
|
|
|
| Orion
Oyj, Turku, Finland |
2008-2009 |
Design
of a new department for the
hormonal gel and solution
manufacturing |
|
|
|
| United
Construction Co., Islamabad,
Pakistan |
2008 |
Basic
design of the layout, HVAC and
clean utilities for Serum Lab
project |
|
|
|
| Orion
Oyj, Turku, Finland |
2008 |
Improving
containment of an existing and
a new production units |
|
|
|
| Kemwell
AB (legacy Pfizer Health),
Uppsala, Sweden |
2008 |
New CIP
station |
|
|
|
|
|
| Solaris
,
Russia
|
2008 |
Conceptual
Conceptual
design of a new parenteral
factory |
|
|
|
| |
|
| Sotex
,
Russia |
2008 |
Concep
tual of a biopharmaceutical
factory |
|
| |
|
| Novo
Nordisk
,
De
nmark |
2008 |
Conceptual
design of a fill finish
factory |
|
| |
|
| Lupin
, Indi
a
|
2008 |
Conceptual,
basic and detailed design of a
biopharmaceutical factory |
|
| |
|
| Atacama
Labs.
He
lsinki
,
Finland |
2008 |
Conceptual
design of a new dry
granulation system |
|
| |
|
| Cinpharm
,
Cameroun
|
2007
- 2008 |
Basic
and detailed design of an
infusion solution factory |
|
| |
|
| NNEPharmaplan,
Kuopio
,
Finland |
2007
- 2008 |
Detailed
design of a biopharmaceutical
factory |
|
| |
|
| Kemwell
AB (legacy Pfizer Health),
Uppsala
,
Sweden |
2007
- 2008 |
Several
revamping projects in the
synthesis facto
ry |
|
| |
|
| Orion
Pharma,
Turku
, Finland
|
2007
- 2008 |
Conceptual
design of a new manufacturing
facility |
|
| |
|
| Massoud
Pharmaceuticals
,
Syria |
2007
- 2008 |
| Concept
Design, Basic Engineering,
Detail Engineering, Validation
and Site Management for
complete IV bags
Pharmaceutical plant. |
|
| |
|
| Torrent
Pharmaceuticals Limited,
Ahmedabad
,
India |
2007-2008 |
Concept
Design, Basic Engineering,
Detail Engineering, Validation
and Validation Management for
complete OSD Pharmaceutical
plant with 20% low RH facility
for dedicated US Market
produce |
|
| |
|
| Razi
Pharmaceuticals, Saudi Arabia |
2007 |
Conceptual
Design, Basic Engineering, Detailed
Engineering and Site
Management for complete
Generic Pharmaceutical plant |
|
| |
|
| Pharmadule
Ltd, Stockholm, Sweden |
2007 |
Conceptual
design of a new biotech
production plant
|
|
| |
|
| Tallinn
Pharmaceutical Factory,
Tallinn, Estonia |
2007 |
Design
of the treatment plant for
oily process waste water
|
|
| |
|
| Pfizer
Health Ltd, Strängäs, Sweden |
2007 |
Turn-key
delivery of automation and
instrumentation for a RO-loop
|
|
| |
|
| Pfizer
Health Ltd, Strängäs, Sweden |
2007 |
Validation
plans and validation of new
laboratory
|
|
| |
|
| Phadia
AB, Uppsala, Sweden (legacy
Pharmacia Diagnostics) |
2007- |
Conceptual
and detailed design for
modification of an existing
production unit
|
|
| |
|
| Inno
Biologics Sdn. Bhd., Malaysia |
2007- |
Conceptual
design of the new
multi-product cGMP large-scale
Biopharmaceutical production
facility.
|
|
| |
|
| Orion
Pharma, Turku, Finland |
2007- |
Conceptual
and detailed design of a new
clean steam system
|
|
| |
|
| Orion
Pharma, Turku, Finland |
2007 |
Revamping
of an existing purified water
system
|
|
| |
|
| GE
Healthcare Bio Sciences AB,
Uppsala, Sweden |
2007 |
Feasibility
study for the transfer of
manufacturing site
|
|
| |
|
| Pfizer
Health Ltd, Strängäs, Sweden |
2006-2007 |
Revamping
of WFI distribution system
|
|
| |
|
| Pfizer
Health Ltd, Strängäs, Sweden |
2006-2007 |
Coordination
and life-cycle concepts for
the demolishing of an existing
production facility.
|
|
| |
|
| Larox
Ltd, Lappeenranta Finland |
2006- |
Preparing
cGMP documentation packages
for the Larox bio and pharma
filters
|
|
| |
|
| Hind
Biopharmaceuticals Ltd,
Patiala, Punjab, India |
2006- |
Concept
design, Basic Engineering,
Detail Engineering, Validation
for FMD Vaccine. Complete
green field project and BSL 3
grade of protection.
|
|
| |
|
| Barakat
Labs, Aleppo, Syria |
2006- |
Conceptual-,
basic-, detailed engineering
and validation of a
fill-finish plant for
injectables in Ampoules and
Vials.
|
|
| |
|
| SCP
Ltd, Tainan, Taiwan |
2006- |
Conceptual
design, engineering,
commissioning and validation
Complete HVAC and clean room
system.
|
|
| |
|
| Orion
Pharma, Espoo, Finland |
2006- |
Conceptual
design for modernising an
existing warehouse and for
building a new automatic
dispensing line.
|
|
| |
|
| Lab
Pharma Ltd, Turku, Finland |
2006- |
Qualifications
IQ/OQ of the process
equipment.
|
|
| |
|
| Orion
Pharma, Turku, Finland |
2006- |
Design
to change the HVAC-system of
an existing tabletting
department.
|
|
| |
|
| Pfizer
Health AB, Strängnäs, Sweden |
2006- |
Revamping
of an existing production
plant for biopharmaceuticals.
|
|
| |
|
| GE
Healthcare Bio Sciences AB,
Uppsala, Sweden |
2006- |
Conceptual
design of the upgrading of the
purified water system for 13
production buildings at site
Uppsala.
|
|
| |
|
| UniTech
Pharma AB, Matfors, Sweden |
2006- |
Technical
specifications of the
production equipment for a new
formulation, filling, freeze
drying and packaging facility.
|
|
| |
|
| PharmFirm
Sotex, Moscow, Russia |
2006- |
Cleaning
validation of the new
formulation and filling line.
|
|
| |
|
| Standard
Chem&Pharm, Tainan, Taiwan |
2006- |
Conceptual
design for the upgrading of
the existing facility
according to EU quidelines.
|
|
| |
|
| Pfizer
Health AB, Strängnäs, Sweden |
2005- |
Feasibility
study regarding the
Fermentation support
laboratory.
|
|
| |
|
| Torrent
Pharmaceuticals Ltd, Ahmedabad,
India |
2005- |
Conceptual-,
basic-, detailed engineering
and validation of a fillfinish
plant for insulin.
|
|
| |
|
| Q-MED
AB, Uppsala, Sweden |
2005- |
Basic
design, upgrading of an
existing production unit,
HVAC, clean rooms, utilities.
|
|
| |
|
| Pharmacia
Diagnostics, Uppsala, Sweden |
2005- |
GMP-upgrading
of process installations.
|
|
| |
|
| AWA
Medica, Kurdistan |
2005- |
Conceptual
design of a new pharma
manufacturing site including 6
factories, warehouse, utility
buildings, laboratory
buildings, power plant and
tank yard.
|
|
| |
|
| Pfizer
Health AB, Uppsala, Sweden |
2005- |
Conceptual
and basic design of an
effluent treatment plant.
|
|
| |
|
| Pfizer
Health AB, Strängnäs, Sweden |
2005- |
Basic
Design for a loading and
unloading station for a pharma
factory site.
|
|
| |
|
| Amersham
Biosciences AB(General
Electric Healthcare), Uppsala,
Sweden |
2005- |
Turnkey
delivery of the process, clean
media with clean rooms for a
GMP upgrading of an existing
product.
|
|
| |
|
| Recopharma
AB, Luleå, Sweden |
2004- |
Conceptual
design of a new biotech pilot
plant + alternative site in
Stockholm.
|
|
| |
|
| Novozymes
AB, Lund, Sweden |
2004- |
Upgrading
GMP compliance of an existing
bio production plant, basic
design.
|
|
| |
|
| SBL
Vaccin AB, Stockholm, Sweden |
2004- |
Basic
design of a biotech
purification plant
|
|
| |
|
| Eskayef
Bangladesh Ltd, Bangladesh |
2004- |
Conceptual
design , basic design,
detailed design and validation
of the new site including
several production blocks.
|
|
| |
|
| Amersham
Biosciences (General Electric
Healthcare), Uppsala, Sweden |
2004- |
Basic
design, upgrading GMP
compliance of an existing
production unit
|
|
| |
|
| Universiti
Putra, Malaysia |
2004- |
Conceptual
and basic design of a
multiproduct cGMP
Biopharmaceutical production
Facility
|
|
| |
|
| Q-MED
AB, Uppsala, Sweden |
2004- |
Conceptual
design for changing a process
into LAF-environment
|
|
| |
|
| Pharmadule
Emtunga AB Gothenburg, Sweden |
2004 |
Detailed
piping design of a
biopharmaceutical plant to
Lilly, England
|
|
| |
|
| UniTech
Pharma AB Matfors, Sweden |
2003 |
Basic
design of a new formulation,
filling, freeze drying and
packaging facility
|
|
| |
|
| FIT
Biotech Oy Tampere, Finland |
2003 |
Conceptual
design for the increasing of
the clean room production
facility
|
|
| |
|
| Inno
Biologics Sdn. Bhd., Malaysia |
2003 |
Conceptual
and basic design of a
multiproduct cGMP
biopharmaceutical production
facility.
|
|
| |
|
| SBL
Vaccin AB Stockholm, Sweden |
2003 |
Basic
engineering of Vaccine
production plant including Bio
Safety Level 3 production
areas.
|
|
| |
|
| Pharmacia
AB Strängnäs, Sweden |
2003 |
IQ/OQ
on site for modifications for
a production plans.
|
|
| |
|
| Q-MED
AB Uppsala, Sweden |
2003 |
Conceptual,
basic and detailed design of a
new production facility.
|
|
| |
|
| Pharmacia
Diagnostics Uppsala, Sweden |
2002-2003 |
GMP-upgrading
of equipments and
installations.
|
|
| |
|
| Fresenius
Kabi AB Uppsala, Sweden |
2002-2003 |
Increasing
the capacity of the cooling
system for the formulation
tanks.
|
|
| |
|
| Pharmacia
Strängnäs, Sweden |
2002-2003 |
Prestudy
for an inactivation plantfor
several production facilities.
|
|
| |
|
| Octapharma
AB Stockholm, Sweden |
2002-2003 |
Revamping
of an existing purification
plant for proteins.
|
|
| |
|
| Biovitrum
AB Stockholm, Sweden |
2002-2003 |
Turn-key
delivery of the automation
system (acc to GAMP4 and 21
CFR Part 11 incl ER/ES) for a
biotech pilot plant.
|
|
| |
|
| AstraZeneca
AB Södertälje, Sweden |
2002-2003 |
Turn-key
delivery of a formulation unit
for Nexium iv factory.
Automation according to GAMP4
and 21 CFR Part 11 compliant,
including ER/ES.
|
|
| |
|
| Orion
Pharma Oy Turku, Finland |
2002 |
Qualifications
IQ/OQ of the purified water
system in the new research
building.
|
|
| |
|
| Pharmadule
AB Stockholm, Sweden |
2002 |
Technical
specifications for filling
lines and freeze dryers
|
|
| |
|
| Pharmacia
AB Strängnäs, Sweden |
2002 |
Front
End Engineering of two
strategic projects.
Coordination of the time
schedule for the strategic
projects
|
|
| |
|
| Pharmacia
AB Strängnäs, Sweden |
2002 |
Detailed
engineering and executionfor
compliance upgrading of two
existing biotech plants.
|
|
| |
|
| Pharmadule
AB Stockholm, Sweden |
2002 |
Project
management for a filling line,
co-ordination of IQ and OQ
activities in Sweden and on
site in USA.
|
|
| |
|
| Pharmacia
AB Uppsala, Sweden |
2002 |
Project
co-ordination concerning
integrated IQ, OQ and PQ
activities for Syringe Center.
|
|
| |
|
| Biovitrum
AB Stockholm, Sweden |
2001-2002 |
Basic
and detailed engineering of a
biotech pilot plant including
cell culture fermentation,
purification, clean utility
and other utility systems.
|
|
| |
|
| Pharmadule
AB Stockholm, Sweden |
2001-2002 |
Basic
engineering of a biotech pilot
plant including cell culture
fermentation, purification,
clean utility and other
utility systems.
|
|
| |
|
| Focus
Inhalation Oy Turku, Finland |
2001 |
User
requirement specifications for
clean rooms, process
equipment, utility systems and
automation system.
|
|
| |
|
| SBL
Vaccin AB Stockholm, Sweden |
2001 |
Documentation
of an existing process unit.
|
|
| |
|
| Fresenius
Kabi AB Uppsala, Sweden |
2001 |
Start-up
and boosting the capacity of a
filling line.
|
|
| |
|
| Pharmacia
& Upjohn Puurs, Belgium |
2000-2001 |
User
requirement specifications (URS)
and participation in the
procurement of the freeze
dryers
|
|
| |
|
| Pharmacia
& Upjohn Strängnäs,
Sweden |
2000-2001 |
Predesign
and cost calculations for a
biotech factory.
|
|
| |
|
| Pharmacia
& Upjohn Stockholm, Sweden |
2000-2001 |
Documentation
of an existing process unit.
|
|
| |
|
| Medipolis
Oy, Oulu Finland |
2000-2001 |
Detailed
engineering of clean utility
systems, purchasing,
installation supervision and
validation IQ/OQ. Planning of
the automation and SCADA for
the whole pilot plant process
and clean rooms.
|
|
| |
|
| Pharmacia
& Upjohn Stockholm, Sweden |
1999-2001 |
Detailed
engineering of a protein
purification plant,
purchasing, installation
supervision and validation IQ/OQ.
|
|
| |
|
| Pharmacia
& Upjohn Uppsala, Sweden |
1999-2001 |
Several
revamping projects in a
synthesis factory.
|
|
| |
|
| Santen
Oy Tampere, Finland |
1999-2000 |
Wet
plant project. Participating
in writing URS for WFI and
pure steam systems. Writing
the validation master plan for
the project. Design and
installation supervision.
|
|
| |
|
| BioTie
Therapies Oy Turku, Finland |
1999-2000 |
Basic
engineering of a biotech plant
for pharmaceuticals.
|
|
| |
|
| Pharmacia
& Upjohn Uppsala, Sweden |
1997-2000 |
'Syringe
Center'. User requirement
specifications, participation
in the procurement, delivery
supervision, start-up and IQ/OQ
for the freeze dryers and
formulation process including
CIP/SIP system. 3D-Modelling
of the plant including process
equipment and the clean rooms.
Project time scheduling and
supervision. Qualification of
the clean utility systems, WFI,
PW, pure steam and gases.
|
|
| |
|
| Pharmacia
& Upjohn Uppsala, Sweden |
1999 |
Pre-
and detailed design of the WFI-
and pure-steam center as well
as the distribution loops and
pipes. Participation in IQ/OQ
|
|
| |
|
| Pharmacia
& Upjohn Strängnäs,
Sweden |
1999 |
Pre-
and detailed design of the WFI-
and pure-steam center as well
as the distribution loops and
pipes. Participation in IQ/OQ
|
|
| |
|
| Rörsystem
AB/Pharmacia & Upjohn
Uppsala, Sweden |
1999 |
Detailed
design and IQ/OQ of the pure
steam system for the Syringe
Center project.
|
|
|
|
|
|