HVAC References
 
General HVAC References  
Ilmasäätö Oy   2009
Finnish Family federation laboratory modification
HVAC design
Detailed design
 
Sunborn International Ltd, Barcelona, Spain   2008
Barcelona hotel yacht AC design
Basic Design
YIT Building Systems Oy, Turku, Finland   2008
Logistics terminal, 13.000 m2
Basic design, detail design  
KOy Kerttula ice hall, City of Raisio, Finland  2007
Ice hockey training hall
Basic design, detail design  
City of Raisio, Finland   2005 and 2007
Rebuilding of Vaisaari school air conditioning
Basic design, detail design
Senate Properties, Turku, Finland 2005-2007
Court house, cooling
Province archive, cooling
Signum building, cooling
Academy
building, heating and cooling
Axelia
building, cooling  
Supporters' association for the Turku Finnish Coeducational School, Finland   2004-2007
HVAC rebuilding of the school
Basic design, detail design  
Ovako Wire Oy Taalintehdas and Koverhar, Finland 2005-2007
Rebuilding of control room air conditioning, electrical and MCC rooms
Rebuilding of office and repair workshop area air conditioning
Rebuilding of repair workshop air conditioning 
City of Turku, Finland 2004-2005
Rebuilding of Aurakatu school air conditioning. Basic design, detail design. 2005
Rebuilding of the Luolavuori school, 6.000 m2 Basic design, detail design. 2004-2005
City of Raisio, Finland   2003
Revamping of the municipal waste water treatment plant
Detail design  
YIT Building Systems Oy, Turku, Finland   2004-2006
Turku hospital of internal diseases, rebuilding of bed department, 6.600 m2
Basic design, detail design

City of Turku, Finland

2003-2006
Turku Main Library, new building and rebuilding, 11.000 m2
Basic design, detail design

Senate Properties, Finland

2003-2007
The new County Prison of Southwestern Finland, 38.000 m2
Basic design, detail design; explosive dangerous area included  

Senate Properties, Finland

2003
The University of Turku , Didacticum; 3.000 m2
Basic design, detail design; 3D design with Cadmatic

KOy Raision Koepainolaitos, Finland

2002
Future Printing Center, test printing house, 2.900 m2
Basic design, detail design; explosive dangerous and climate areas included  

KOy Jämsän Komposiittihalli, Kuorevesi, Finland

2001-2003
HVAC design of production spaces, 18.700 m2
Basic design, detail design; climate and classified areas included

Senate Properties, Turku, Finland

2001-2002
Rebuilding of air conditioning of the Rauma city office building, 800 m2
Basic design, detail design
               

Rebuilding of air conditioning of the courthouse, 5.000 m
2
Basic design, detail design  

City of Raisio, Finland

1999-2002
Rebuilding of Tahvio school, 1.500 m2 Basic design, detail design. 2002
Rebuilding of air conditioning of the Kuloinen school. Basic design, detail design. 2001
Senior high school of Raisio, 3.000 m2  Basic design, detail design. 1999  

Foundation for Åbo Academi, Turku, Finland

2001-2003
Rebuilding of Arken Area, 18.500 m2
Basic design, detail design

Valmet Ilmatekniikka Oy, Finland

1999
Bargo, Verzuolo, ventilation in environmental spaces, Italy

 

 

Copyright © 2005- Elomatic Oy, All rights reserved