| |
|
| Vammalan
Lämpö Ltd
|
1999-2008
|
Pre- and detailed design of Vammala district heating network
Supplementary design for district heating network
|
|
| |
|
| Puolustushallinnon
rakennuslaitos |
2002-2008
|
Cost surveys of the heating service for several objects
Comparing the heat suppliers for the objects
|
|
| Fortum
Power and Heat Ltd
|
2007
|
Heat recovery survey, district heating survey. District cooling survey
Spare oil boiler, predesign and documentation of invitation for
tenders
|
|
| |
|
| Fortum
Lämpö Ltd |
2004-2007
|
Several district heating
surveys
Dimensioning and detailed design of the district heating network
Natural gas boiler plant, predesign, cost review, procuration
design and specification
Simulation and modelling of Nokia district heating network
|
|
| |
|
| Harjavallan
Kaukolämpö Ltd |
2006-2007
|
Simulation and modelling of the district heating
network
Design for procuring of the heating plant boiler. Drafting of
the environmental licence application
Design of district heating network. Dimensioning, detailed design and documentation of invitation for
tenders
|
|
| |
|
| Heinäveden
Aluelämpö Ltd |
2003-2007
|
Surveys of the heat recovery and washer in the heating
plant
Long-term plan of district heating function
Consulting in purchasing of a solid fuel heating plant, drafting of the environmental licence application. Installation inspection. Acceptance
inspection
|
|
| |
|
| Oy
Kohiwood Ltd |
2007
|
Survey of the heat supply of a sawmill and heating
plant
|
|
| |
|
| Pori
Energia Ltd |
2001-2007
|
Comparing the heat supply and heating
entrepreneur
Pre- and detailed design of the district heating connection of a power
plant
|
|
| |
|
| Visuvesi
Ltd |
2007
|
Heating power plant
survey
|
|
| Pälkäne
Municipality |
2007
|
Heating plant, determination of value, consulting of management
and contract negotiations
|
|
| |
|
| Pariwood
Ltd |
2007
|
Consulting in use and combustion technique of two different boiler plants
|
|
| |
|
| Jyväskylä
Innovation Ltd |
2001-2006
|
Consulting in use and combustion technique of two different boiler plants
|
|
| |
|
| Jyväskylän
Polytechnic |
2001-2006
|
Several surveys in use and promotion of bioenergy
|
|
| |
|
| Forest
Centre |
2001-2006
|
Several district heating and
bioenergy surveys for regional forest centres
|
|
| |
|
| Jämsek
Ltd |
2006
|
Energy survey in Himos tourist attraction. Basic survey of heat
production
Cost calculations
|
|
| |
|
| Koskisen
Ltd |
2000-2006
|
Design of the standby power system in heat production of a sawmill. Process design and
dimensioning
Modelling and operation review of the heat distribution network
Design of the connection of underground steam, condensate and hot water pipelines in a boiler plant
|
|
| |
|
| Ovako
Bar Ltd |
2006
|
Steam generator plant 2 x 5 t/h,
predesign, purchasing program, documentation of invitation for tenders and tender
comparisons
Predesign of the steam production system in Imatra steel factory to guarantee the working reliability. Process design, instrument dimensioning and layout, cost
calculation
|
|
| |
|
| Tammisaaren
Energia |
2005-2006
|
District heating inspection according to Motiva inspection
model
Construction of the simulation model of a district heating network, survey of the network’s
operation
Survey of a heating power plant
Flue gas washer. dimensioning and process design, layout design, cost calculation and feasibility
study
|
|
| |
|
| Ääneseudun
Energia Ltd |
2005
|
Consulting of purchasing, purchasing program, tender documentation, tender comparisons and contract documentation of a heating
plant
District heating survey
Dimensioning, pre- and detailed design of district heating network
|
|
| |
|
| Savitaipale
municipality |
2004-2005
|
Renovation of heating plant. Main contractor. Documentation for invitations for tenders and purchasing. Drafting of investment grant and environmental
license applications. Tender negotiations, tender comparisons, and drafting of agreement documentation. Site meetings. Installation
inspection
|
|
| |
|
| Ulvilan
Lämpö Ltd |
2005
|
Detailed design of a regional heating
network
Drafting of the documentation for invitations for tenders and purchasing program for a pellet heating
plant
Drafting of the sales tariff of district heating
|
|
| |
|
| Huittisten
Lämpö Ltd |
2005
|
Pre- and detailed design of the underground steam line DN150, condensate line DN65 and heat transfer line DN250
|
|
| |
|
| J.M.
Huber Corporation |
2005
|
Survey of the waste heat reclamation from boiler flue gases for Taavetti factory. Dimensioning, design and feasibility study of heat recovery
|
|
| |
|
| Pudasjärvi
town |
2005-2007
|
Detailed design of the main line of district heating DN250 (abt. 5 km).
Piping design of the connections of district heating plants
Survey of process and way of running of district heating
Heating power plant, survey. District and process heating for a
sawmill
Survey of alternatives in heating supply
|
|
| |
|
| Vapo
Oy Energia |
2002-2005
|
Dimensioning of district heating network and cost
estimation
Small power plant survey
|
|
| |
|
| Laihian
Nuuka Lämpö Ltd |
2000-2002
|
Design and projecting of a heating plant. 2000-2002
Dimensioning and design of a district heating network. 2000
|
|
| |
|