Energy consulting references
   
City of Pudasjärvi 2008-2009  
 

Consulting in the procurement of a solid biofuel-fired district heating plant
Pre- and procuration design of district heating network
 
Savon Voima Ltd 2009  
 

Predesign of a flue gas scrubber, consulting in the scrubber unit procurement
 
Municipality of Sievi 2008-2009  
 

Renewable energy audit for Municipality of Sievi according to the Motiva model
Study on district heating production and delivery, procuration design of district heating network
 
Laihian Nuuka Lämpö Ltd 2009  
 

Pre-, process and procuration design of flue gas scrubber and humidifier units
 
Vesi-Mega Ltd 2008  
 

ATEX study and documentation for Hyrynsalmi district heating plant
 
Loimaan Kaukolämpö Ltd 2008  
 

CHP study
 
Ulvilan Lämpö Ltd 2008  
 

Study on district heating network’s operation in the City of Ulvila at present and in the long run, modeling and simulating the DH network 
Guarantee audit for district heating plant
 
Formica IKI Ltd 2008  
 

Procuration design of an oil boiler plant, piping design
 
Logstor Finland Ltd 2008  
 

Industrial energy analysis according to the Motiva model
Procuration design of heating system
 
Municipality of Vähäkyrö 2008  
 

Renewable energy audit for Municipality of Vähäkyrö according to the Motiva model
Managing heat supply’s competitive bidding
 
Finnforest Ltd 2008  
 

Pre- and detailed design of Vammala district heating network
Supplementary design for district heating network
 
Vammalan Lämpö Ltd 1999-2008  
 

Pre- and detailed design of Vammala district heating network
Supplementary design for district heating network
 
   
Puolustushallinnon rakennuslaitos 2002-2008  
 

Cost surveys of the heating service for several objects
Comparing the heat suppliers for the objects
 
Fortum Power and Heat Ltd 2007  
 

Heat recovery survey, district heating survey. District cooling survey
Spare oil boiler, predesign and documentation of invitation for tenders
 
   
Fortum Lämpö Ltd 2004-2007  
 

Several district heating surveys
Dimensioning and detailed design of the district heating network
Natural gas boiler plant, predesign, cost review, procuration 
design and specification
Simulation and modeling of Nokia district heating network


 
   
Harjavallan Kaukolämpö Ltd 2006-2008  
 

Simulation and modeling of the district heating network
Design for procuring of the heating plant boiler. Drafting of 
the environmental license application
Design of district heating network. Dimensioning, detailed design and documentation of invitation for tenders

 

 
   
Heinäveden Aluelämpö Ltd 2003-2008  
  

Surveys of the heat recovery and washer in the heating plant
Long-term plan of district heating function
Consulting in purchasing of a solid fuel heating plant, drafting of the environmental license application. Installation inspection. Acceptance inspection, Procurement planning for new solid fuel heating plant, tender documents, competitive bidding, offer evaluation


 
   
Oy Kohiwood Ltd 2007  
  

Survey of the heat supply of a sawmill and heating plant

 
   
Pori Energia Ltd 2001-2007  
 

Comparing the heat supply and heating entrepreneur
Pre- and detailed design of the district heating connection of a power plant


 
   
Visuvesi Ltd 2007  
  

Heating power plant survey

 
Pälkäne Municipality 2007  
 

Heating plant, determination of value, consulting of management 
and contract negotiations


 
   
Pariwood Ltd 2007  
 

Consulting in use and combustion technique of two different boiler plants

 
   
Jyväskylä Innovation Ltd 2001-2006  
 

Consulting in use and combustion technique of two different boiler plants

 
   
Jyväskylän Polytechnic 2001-2006  
  

Several surveys in use and promotion of bioenergy

 
   
Forest Centre 2001-2006  
  

Several district heating and bioenergy surveys for regional forest centres

 
   
Jämsek Ltd 2006  
 

Energy survey in Himos tourist attraction. Basic survey of heat production
Cost calculations


 
    
Koskisen Ltd 2000-2006  
 

Design of the standby power system in heat production of a sawmill. Process design and dimensioning
Modeling and operation review of the heat distribution network
Design of the connection of underground steam, condensate and hot water pipelines in a boiler plant


 
   
Ovako Bar Ltd 2006  
  

Steam generator plant 2 x 5 t/h, predesign, purchasing program, documentation of invitation for tenders and tender comparisons
Predesign of the steam production system in Imatra steel factory to guarantee the working reliability. Process design, instrument dimensioning and layout, cost calculation


 
   
Tammisaaren Energia 2005-2006  
 

District heating inspection according to Motiva inspection model
Construction of the simulation model of a district heating network, survey of the network’s operation
Survey of a heating power plant
Flue gas washer. dimensioning and process design, layout design, cost calculation and feasibility study


 
   
Ääneseudun Energia Ltd 2005  
  

Consulting of purchasing, purchasing program, tender documentation, tender comparisons and contract documentation of a heating plant
District heating survey
Dimensioning, pre- and detailed design of district heating network


 
   
Savitaipale municipality 2004-2005  
  

Renovation of heating plant. Main contractor. Documentation for invitations for tenders and purchasing. Drafting of investment grant and environmental license applications. Tender negotiations, tender comparisons, and drafting of agreement documentation. Site meetings. Installation inspection

 
   
Ulvilan Lämpö Ltd 2005  
  

Detailed design of a regional heating network
Drafting of the documentation for invitations for tenders and purchasing program for a pellet heating plant
Drafting of the sales tariff of district heating


 
   
Huittisten Lämpö Ltd 2005  
  

Pre- and detailed design of the underground steam line DN150, condensate line DN65 and heat transfer line DN250

 
   
J.M. Huber Corporation 2005  
  

Survey of the waste heat reclamation from boiler flue gases for Taavetti factory. Dimensioning, design and feasibility study of heat recovery

 
   
Pudasjärvi town 2005-2007  
  

Detailed design of the main line of district heating DN250 (about 5 km). 
Piping design of the connections of district heating plants
Survey of process and way of running of district heating
Heating power plant, survey. District and process heating for a sawmill
Survey of alternatives in heating supply


 
   
Vapo Oy Energia 2002-2005  
  

Dimensioning of district heating network and cost estimation
Small power plant survey


 
   
Laihian Nuuka Lämpö Ltd 2000-2002  
  

Design and projecting of a heating plant. 2000-2002
Dimensioning and design of a district heating network. 2000

 
   