| Orion Oyj, Turku, Finland
| 2009 |
Conceptual design for the revamping of an existing tabletting manufacturing facility.
|
|
| |
| Omnitrade, Amman, Jordan
| 2009 |
Conceptual design of a pharmaceutical factory site including several
manufacturing facilities
|
|
| |
| Orion Oyj, Espoo, Finland
| 2009 |
Conceptual design of a new facility for inhalers.
|
|
| |
| Phadia AB, Uppsala, Sweden (legacy Pharmacia Diagnostics)
| 2009 |
Conceptual and detailed design for increasing of production capacity
|
|
| |
| Atacama Labs, Helsinki, Finland
| 2009 |
Automation and qualification of a new dry granulation system
|
|
| |
| Kemwell AB (legacy Pfizer Health), Uppsala, Sweden | 2009 |
Upgrading of the electrical documentation
|
|
| |
| Orion Oyj, Turku, Finland
| 2008-2009 |
Design of a new department for the hormonal gel and solution manufacturing
|
|
| |
| United Construction Co., Islamabad, Pakistan
| 2008 |
Basic design of the layout, HVAC and clean utilities for Serum Lab project
|
|
| |
| Orion Oyj, Turku, Finland
| 2008 |
Improving containment of an existing and a new production units
|
|
| |
| Kemwell AB (legacy Pfizer Health), Uppsala, Sweden
| 2008 |
New CIP station
|
|
| |
| |
| Solaris,
Russia
| 2008 |
Conceptual
Conceptual design of a new
parenteral factory
|
|
| |
| | |
|
Sotex,
Russia | 2008 |
Conceptual of a
biopharmaceutical factory
|
|
| | |
|
Novo
Nordisk,
Denmark | 2008 |
Conceptual design of a
fill finish factory
|
|
| | |
|
Lupin,
India
| 2008 |
Conceptual, basic and
detailed design of a
biopharmaceutical factory
|
|
| | |
|
Atacama
Labs.
Helsinki,
Finland | 2008 |
Conceptual design of a new
dry granulation system
|
|
| | |
|
Cinpharm,
Cameroun
| 2007
- 2008 |
Basic and detailed design
of an infusion solution
factory
|
|
| | |
|
NNEPharmaplan,
Kuopio,
Finland
| 2007
- 2008 |
Detailed design of a
biopharmaceutical factory
|
|
| | |
|
Kemwell
AB (legacy Pfizer Health),
Uppsala,
Sweden
| 2007
- 2008 |
Several revamping projects
in the synthesis factory
|
|
| | |
|
Orion
Pharma,
Turku, Finland
| 2007
- 2008 |
Conceptual design of a new
manufacturing facility
|
|
| | |
|
Massoud
Pharmaceuticals, Syria
| 2007
- 2008 |
|
Concept Design, Basic
Engineering, Detail
Engineering, Validation
and Site Management for
complete IV bags
Pharmaceutical plant.
|
|
| | |
| Torrent
Pharmaceuticals
Limited, Ahmedabad,
India
| 2007-2008 |
Concept Design, Basic
Engineering, Detail
Engineering, Validation
and Validation Management
for complete OSD
Pharmaceutical plant with
20% low RH facility for
dedicated US Market
produce
|
|
| | |
| Razi
Pharmaceuticals, Saudi
Arabia | 2007 |
Conceptual
Design, Basic
Engineering, Detailed
Engineering and Site
Management for complete
Generic Pharmaceutical
plant
|
|
| | |
| Pharmadule
Ltd, Stockholm, Sweden | 2007 |
Conceptual
design of a new biotech
production plant
|
|
| | |
| Tallinn
Pharmaceutical Factory,
Tallinn, Estonia | 2007 |
Design
of the treatment plant for oily process waste
water
|
|
| | |
| Pfizer
Health Ltd, Strängäs,
Sweden | 2007 |
Turn-key
delivery of automation
and instrumentation for
a RO-loop
|
|
| | |
| Pfizer
Health Ltd, Strängäs,
Sweden | 2007 |
Validation
plans and validation of
new laboratory
|
|
| | |
| Phadia
AB, Uppsala, Sweden
(legacy Pharmacia
Diagnostics) | 2007- |
Conceptual
and detailed design for
modification of an
existing production unit
|
|
| | |
| Inno
Biologics Sdn. Bhd.,
Malaysia | 2007- |
Conceptual
design of the new multi-product cGMP
large-scale
Biopharmaceutical
production facility.
|
|
| | |
| Orion
Pharma, Turku, Finland | 2007- |
Conceptual
and detailed design of a
new clean steam system
|
|
| | |
| Orion
Pharma, Turku, Finland | 2007 |
Revamping
of an existing purified
water system
|
|
| | |
| GE
Healthcare Bio Sciences
AB, Uppsala, Sweden | 2007 |
Feasibility
study for the transfer
of manufacturing site
|
|
| | |
| Pfizer
Health Ltd, Strängäs,
Sweden | 2006-2007 |
Revamping
of WFI distribution
system
|
|
| | |
| Pfizer
Health Ltd, Strängäs,
Sweden | 2006-2007 |
Coordination
and life-cycle concepts
for the demolishing of
an existing production
facility.
|
|
| | |
| Larox
Ltd, Lappeenranta Finland | 2006- |
Preparing
cGMP documentation
packages for the Larox
bio and pharma
filters
|
|
| | |
| Hind Biopharmaceuticals Ltd,
Patiala, Punjab, India | 2006- |
Concept design, Basic Engineering, Detail Engineering, Validation for FMD Vaccine. Complete green field project and BSL 3 grade of protection.
|
|
| | |
| Barakat Labs, Aleppo, Syria | 2006- |
Conceptual-, basic-, detailed engineering and validation of a fill-finish plant for injectables in Ampoules and Vials.
|
|
| | |
| SCP Ltd,
Tainan, Taiwan | 2006- |
Conceptual design, engineering, commissioning and validation Complete HVAC and clean room system.
|
|
| | |
| Orion
Pharma, Espoo, Finland | 2006- |
Conceptual design for modernising an existing warehouse and for building a new automatic dispensing line.
|
|
| | |
| Lab Pharma Ltd,
Turku, Finland | 2006- |
Qualifications
IQ/OQ of the process equipment.
|
|
| | |
| Orion
Pharma, Turku, Finland | 2006- |
Design to change the HVAC-system of an existing
tabletting department.
|
|
| | |
| Pfizer Health AB, Strängnäs, Sweden | 2006- |
Revamping of an existing production plant for biopharmaceuticals.
|
|
| | |
| GE Healthcare Bio Sciences AB,
Uppsala, Sweden | 2006- |
Conceptual design of the upgrading of the purified water system for 13 production buildings at site
Uppsala.
|
|
| | |
| UniTech Pharma AB,
Matfors, Sweden | 2006- |
Technical specifications of the production equipment for a new formulation, filling, freeze drying and packaging facility.
|
|
| | |
| PharmFirm
Sotex, Moscow, Russia | 2006- |
Cleaning validation of the new formulation and filling line.
|
|
| | |
| Standard Chem&Pharm,
Tainan, Taiwan | 2006- |
Conceptual design for the upgrading of the existing facility according to EU
quidelines.
|
|
| | |
| Pfizer Health AB, Strängnäs, Sweden | 2005- |
Feasibility study regarding the Fermentation support laboratory.
|
|
| | |
| Torrent Pharmaceuticals Ltd,
Ahmedabad, India | 2005- |
Conceptual-, basic-, detailed engineering and validation of a fillfinish plant for insulin.
|
|
| | |
| Q-MED AB,
Uppsala, Sweden | 2005- |
Basic design, upgrading of an existing production unit, HVAC, clean rooms, utilities.
|
|
| | |
| Pharmacia Diagnostics,
Uppsala, Sweden | 2005- |
GMP-upgrading of process installations.
|
|
| | |
| AWA
Medica, Kurdistan | 2005- |
Conceptual design of a new pharma manufacturing site including 6 factories, warehouse, utility buildings, laboratory buildings, power plant and tank yard.
|
|
| | |
| Pfizer Health AB,
Uppsala, Sweden | 2005- |
Conceptual and basic design of an effluent treatment plant.
|
|
| | |
| Pfizer Health AB, Strängnäs, Sweden | 2005- |
Basic Design for a loading and unloading station for a pharma factory site.
|
|
| | |
| Amersham Biosciences AB(General Electric Healthcare),
Uppsala, Sweden | 2005- |
Turnkey delivery of the process, clean media with clean rooms for a GMP upgrading of an existing product.
|
|
| | |
| Recopharma AB, Luleå, Sweden | 2004- |
Conceptual design of a new biotech pilot plant + alternative site in Stockholm.
|
|
| | |
| Novozymes AB, Lund, Sweden | 2004- |
Upgrading GMP compliance of an existing bio production plant, basic design.
|
|
| | |
| SBL Vaccin AB, Stockholm, Sweden | 2004- |
Basic design of a biotech purification plant
|
|
| | |
| Eskayef Bangladesh Ltd, Bangladesh | 2004- |
Conceptual design , basic design, detailed design and validation of the new site including several production blocks.
|
|
| | |
| Amersham Biosciences (General Electric Healthcare),
Uppsala, Sweden | 2004- |
Basic design, upgrading GMP compliance of an existing production unit
|
|
| | |
| Universiti
Putra, Malaysia | 2004- |
Conceptual and basic design of a multiproduct cGMP Biopharmaceutical production Facility
|
|
| | |
| Q-MED AB,
Uppsala, Sweden | 2004- |
Conceptual design for changing a process into
LAF-environment
|
|
| | |
| Pharmadule Emtunga AB Gothenburg, Sweden | 2004 |
Detailed piping design of a biopharmaceutical plant to Lilly, England
|
|
| | |
| UniTech Pharma AB
Matfors, Sweden | 2003 |
Basic design of a new formulation, filling, freeze drying and packaging facility
|
|
| | |
| FIT Biotech Oy
Tampere, Finland | 2003 |
Conceptual design for the increasing of the clean room production facility
|
|
| | |
| Inno Biologics
Sdn. Bhd., Malaysia | 2003 |
Conceptual and basic design of a multiproduct cGMP biopharmaceutical production facility.
|
|
| | |
| SBL Vaccin AB Stockholm, Sweden | 2003 |
Basic engineering of Vaccine production plant including Bio Safety Level 3 production areas.
|
|
| | |
| Pharmacia AB Strängnäs, Sweden | 2003 |
IQ/OQ on site for modifications for a production plans.
|
|
| | |
| Q-MED AB
Uppsala, Sweden | 2003 |
Conceptual, basic and detailed design of a new production facility.
|
|
| | |
| Pharmacia Diagnostics
Uppsala, Sweden | 2002-2003 |
GMP-upgrading of equipments and installations.
|
|
| | |
| Fresenius Kabi AB
Uppsala, Sweden | 2002-2003 |
Increasing the capacity of the cooling system for the formulation tanks.
|
|
| | |
| Pharmacia Strängnäs, Sweden | 2002-2003 |
Prestudy for an inactivation plantfor several production facilities.
|
|
| | |
| Octapharma AB Stockholm, Sweden | 2002-2003 |
Revamping of an existing purification plant for proteins.
|
|
| | |
| Biovitrum AB Stockholm, Sweden | 2002-2003 |
Turn-key delivery of the automation system (acc to GAMP4 and 21 CFR Part 11 incl ER/ES) for a biotech pilot plant.
|
|
| | |
| AstraZeneca AB Södertälje, Sweden | 2002-2003 |
Turn-key delivery of a formulation unit for Nexium iv factory. Automation according to GAMP4 and 21 CFR Part 11 compliant, including ER/ES.
|
|
| | |
| Orion Pharma Oy
Turku, Finland | 2002 |
Qualifications
IQ/OQ of the purified water system in the new research building.
|
|
| | |
| Pharmadule AB Stockholm, Sweden | 2002 |
Technical specifications for filling lines and freeze dryers
|
|
| | |
| Pharmacia AB Strängnäs, Sweden | 2002 |
Front End Engineering of two strategic projects. Coordination of the time schedule for the strategic projects
|
|
| | |
| Pharmacia AB Strängnäs, Sweden | 2002 |
Detailed engineering and executionfor compliance upgrading of two existing biotech plants.
|
|
| | |
| Pharmadule AB Stockholm, Sweden | 2002 |
Project management for a filling line, co-ordination of IQ and OQ activities in Sweden and on site in USA.
|
|
| | |
| Pharmacia AB
Uppsala, Sweden | 2002 |
Project co-ordination concerning integrated IQ, OQ and PQ activities for Syringe Center.
|
|
| | |
| Biovitrum AB Stockholm, Sweden | 2001-2002 |
Basic and detailed engineering of a biotech pilot plant including cell culture fermentation, purification, clean utility and other utility systems.
|
|
| | |
| Pharmadule AB Stockholm, Sweden | 2001-2002 |
Basic engineering of a biotech pilot plant including cell culture fermentation, purification, clean utility and other utility systems.
|
|
| | |
| Focus Inhalation Oy
Turku, Finland | 2001 |
User requirement specifications for clean rooms, process equipment, utility systems and automation system.
|
|
| | |
| SBL Vaccin AB Stockholm, Sweden | 2001 |
Documentation of an existing process unit.
|
|
| | |
| Fresenius Kabi AB
Uppsala, Sweden | 2001 |
Start-up and boosting the capacity of a filling line.
|
|
| | |
| Pharmacia & Upjohn
Puurs, Belgium | 2000-2001 |
User requirement specifications
(URS) and participation in the procurement of the freeze dryers
|
|
| | |
| Pharmacia & Upjohn Strängnäs, Sweden | 2000-2001 |
Predesign and cost calculations for a biotech factory.
|
|
| | |
| Pharmacia & Upjohn Stockholm, Sweden | 2000-2001 |
Documentation of an existing process unit.
|
|
| | |
| Medipolis
Oy, Oulu Finland | 2000-2001 |
Detailed engineering of clean utility systems, purchasing, installation supervision and validation
IQ/OQ. Planning of the automation and SCADA for the whole pilot plant process and clean rooms.
|
|
| | |
| Pharmacia & Upjohn Stockholm, Sweden | 1999-2001 |
Detailed engineering of a protein purification plant, purchasing, installation supervision and validation
IQ/OQ.
|
|
| | |
| Pharmacia & Upjohn
Uppsala, Sweden | 1999-2001 |
Several revamping projects in a synthesis factory.
|
|
| | |
| Santen Oy
Tampere, Finland | 1999-2000 |
Wet plant project. Participating in writing URS for WFI and pure steam systems. Writing the validation master plan for the project. Design and installation supervision.
|
|
| | |
| BioTie Therapies Oy
Turku, Finland | 1999-2000 |
Basic engineering of a biotech plant for pharmaceuticals.
|
|
| | |
| Pharmacia & Upjohn
Uppsala, Sweden | 1997-2000 |
'Syringe Center'. User requirement specifications, participation in the procurement, delivery supervision, start-up and
IQ/OQ for the freeze dryers and formulation process including CIP/SIP system. 3D-Modelling of the plant including process equipment and the clean rooms. Project time scheduling and supervision. Qualification of the clean utility systems,
WFI, PW, pure steam and gases.
|
|
| | |
| Pharmacia & Upjohn
Uppsala, Sweden | 1999 |
Pre- and detailed design of the
WFI- and pure-steam center as well as the distribution loops and pipes. Participation in
IQ/OQ
|
|
| | |
| Pharmacia & Upjohn Strängnäs, Sweden | 1999 |
Pre- and detailed design of the
WFI- and pure-steam center as well as the distribution loops and pipes. Participation in
IQ/OQ
|
|
| | |
| Rörsystem AB/Pharmacia & Upjohn
Uppsala, Sweden | 1999 |
Detailed design and
IQ/OQ of the pure steam system for the Syringe Center project.
|
|
|
|
|
|
|
|